Dream of a Truro River footbridge is one step closer

The Truro Loops and Truro River Working Group are keeping up efforts to bring a footbridge across the Truro River at Lighterage Quay

We believe a bridge would play a crucial role in opening up and connecting pedestrian and cycle routes across Truro, giving greater access to the river and the beautiful countryside south of Truro for residents and visitors to enjoy.

Artist’s impressions showing previous proposals for a footbridge at Lighterage Quay.

We aren’t the only ones that think so! When canvassing local opinions, over 1,400 locals and visitors also registered their support, believing a bridge would be a great asset to Truro.

Artist’s impressions showing previous proposals for a footbridge at Lighterage Quay.

This summer, Cornwall Council made an application to the Secretary of State for Transport for an order to authorise works in connection with a part fixed and part swinging pedestrian bridge.  The Truro River Working Group has written to the Secretary of State expressing our strong support for the application.   You can read our submission below.

If you are interested in this issue, please follow our social media channels or check the news page on our website for updates.

Images showing the Lighterage Quay area.

Images showing the Lighterage Quay area.


7th July 2026

Dear Secretary of State

Public consultation on the Lighterage Quay Bridge by Truro River Working Group and Truro Loops volunteers – over One Thousand One Hundred and Fifty (1,157) locals and visitors registered support for the bridge to date!

The Truro River Working Group CIC wishes to express its support for the application to construct a footbridge over the Truro River at Lighterage Quay

The following information is provided to demonstrate the level of public consultation which has been undertaken, and the public support which exists.

1.         The Truro River Working Group (TRWG)-was established in 2016 to establish sustainable links for the city which will reduce reliance on car-based transport, in turn reducing pollution, road congestion, as well as improving health, wellbeing and the environment of local residents and visitors.* Working in collaboration with both Truro City Council (TCC) and Cornwall Council (CC) the “Truro Loops” project was developed identifying a series of walking and cycling routes around the city and linking the city with the Truro River and surrounding countryside.

2.         The TRWG was established as a Community Interest Company (CIC), reporting annually to the Charity Commission, and was able then to access European Social Funding (ESF) to develop the concept of “Truro Loops”. A feasibility study was commissioned by the TRWG and published in 2018 and subsequently developed further working with partners including Cornwall Council and Truro City Council.

3.         To date 4 “loops” have been established, including the “Moresk Forest Trail”, the “City Loop”, the “Newham Trail”, and the “Truro River Loop”. The studies identified the need for a crossing of the Truro River at Lighterage Quay to complete the “Truro River Loop” and connect Boscawen Park with the “Newham Trail” on the western side of the river.

4.         In 2021 the Lighterage Quay lifting bridge project was included in the Truro Town Deal Fund bid with the aim to provide an iconic piece of infrastructure for Truro and is believed to have played a significant role in securing the Town Deal funding of £23.6M.

5.         The intent is that the bridge is for pedestrians, cyclists and wheelchair users, with the remit “to deliver a walking and cycling infrastructure to create a connected and coherent transport network through the city, linking residential areas with key destination points and leisure trails both within and beyond the City”. *

* Truro Town Deal, Public Engagement Report Feb 2024, sections 1.1, 1.2. 1.2.1

6.         Since then, the TRWG Loops Project has continued with a group of volunteers guided by the TRWG Board. A “Truro Loops” website has been created, and publicity material produced including guides to the “loops”. The volunteer group was invited by TCC in 2023 to establish an office in the newly built community building in Boscawen Park from which to promote the Truro Loops, and keep the public informed of developments across all the Town Deal projects.^ The room is staffed by volunteers on a part-time basis (Wednesday, Friday and Saturday morning), and the bridge has been the overriding interest over the last three years. The Loops Project has developed networking and communication with other voluntary groups of cyclists, walkers, and river users, attended events and meetings in and around the city and communicated with the TCC on issues raised by members of the public concerning the bridge, safety, paths and access, during this time.

^ See also action identified in Consultation Report, Public Consultation, TRWG, 3.5.2

7.         In October 2024, Lifting-bridge Planning Application PA24/05179 was put online via the CC website for public consultation. TRWG/Truro Loops submitted comments in support of the application and led a campaign to encourage members of the public to register their support using the CC Planning Portal.  More than 140 residents of Cornwall logged on to the CC planning portal to express their support for the project, and 17 registered objections before the application was withdrawn in June 2025.

8.         During the period of CC Planning consultation, it was found that many people came to the Loops Room expressing support but not confident with the online process – a paper petition was started for them to record their name, postcode, date, whether they were in favour of the bridge, and a space for a short comment if required. This process carried on after the online lifting-bridge application was withdrawn in preparation for its replacement by the swing-bridge application.  The recording of 1,197 locals and visitors in favour of the bridge has been reached by 4th July 2026 (including the 140 online supporting comments).

Public frustration with delays in the build start, and with the resulting inflationary costs, can be seen in the comments – often: ‘Get On With It’.

9.         Significant housing development has taken place on the Newham side of the Truro River since the original proposal to install a crossing over the Truro River, and new planning applications are still being received. These developments, which will amount to approaching 1000 new homes, all have pedestrian access onto the Newham Trail and residents will therefore be able to access the leisure facilities at Boscawen Park via the proposed bridge without the need to travel by car across the city.

In conclusion we believe that the proposal to construct a bridge across the Truro river has received widespread public support and urge the Secretary of State to grant the Order.
Yours sincerely,

Sue Brown,
Chairperson, Truro River Working Group CIC